Commercial
Acacia Garage Repairs and Waterproofing
Donley’s Restoration Group worked with Acacia on the Green Condominium Association to restore the onsite parking garage. Donley’s worked with EDI Building Consultants, the engineers on this project. The scope of work on Acacia Garage Repairs and Waterproofing included: 83,000…
O’Neil’s Parking Deck
The O’Neil’s parking Deck structure was built for the City of Akron to serve the parking needs of the O’Neil’s Office Building and Canal Park, Akron’s downtown baseball stadium. The stair/elevator lobbies have direct access to several floors of the…
Weston Towers
The 427,000 sq. ft. Weston Towers project comprised two separate office buildings to house MetLife’s Global Technology and Operations Hub. It includes two, seven-story office buildings; a four-level, 934-space precast parking garage; a four-level, 1,020-space precast parking deck; and 170…
The Quay
Donley’s served as the concrete contractor on a three-building expansion within Bishop Gadsden’s retirement community, The Quay, in Charleston, South Carolina. The new 4-story buildings added 45 residential flats to the campus. Donley’s scope of work included: typical pile cap…
Hilton Convention Center Hotel
Donley’s served as the concrete contractor to Turner Construction, on the new Hilton Cleveland Convention Center Hotel, located in downtown Cleveland. The hotel was completed in time for the 2016 Republican National Convention, held July 18-21, 2016. Donley’s scope of work included: Structural…
Legacy Village Parking Deck
The 135,100 sq. ft. post-tension, cast-in-place concrete Legacy Village Parking Deck structure accommodates 355 vehicles on five levels. Donley’s also served as the Construction Manager for a new 135-room hotel that includes three meeting rooms that can be combined into a…
Parking Deck D/B Structural Frame
This new parking deck, (Parking Deck D/B Structural Frame), is adjacent to the insurance company’s new training center in downtown Erie. In addition to its use by Erie Insurance Company employees, the structure is also used for supplemental parking for…
First & Main Parking Deck
Located in historic downtown Louisville, the First & Main Parking Deck was constructed to meet demand created by area developments and attractions. The structure features a brick facade with stone and curved arches that complement the architectural character of the…
Bowery Street Parking Deck Expansion
The project included a 65,000 sq. ft. expansion to the east of the existing parking deck consisting of a slab-on-grade level and two elevated decks. Construction also included an 88,000 sq. ft. addition above the existing structure consisting of two…
Opportunity Park Parking Deck
The Opportunity Park Parking Deck was Donley’s second Design/Build garage project for the City of Akron. The 900-car, 313,936 SF parking facility is constructed of post-tensioned, cast-in-place concrete. Donley’s work consisted of demolition of the existing north garage and ramp,…