Acacia On The Green Garage Repairs
Donley’s provided concrete restoration services on the Acacia on the Green Garage Repairs project in Lyndhurst, OH. During the project’s seven-month schedule at the condominium community, various structural concrete and waterproofing repairs were made across the elevated parking deck and…
Progressive Field Topping Slab Replacements
The renovations for Progressive Field topping slab replacements consisted of concrete removal, waterproofing, and replacement of approximately 20,000 sq. ft. of elevated structural deck topping slabs. Most of the restoration work occurred during the Cleveland Indians’ off-season. Donley’s also took…
Huntington Parking Garage
Donley’s Restoration Group served as the design-assist subcontractor to repair and upgrade Cuyahoga County’s Huntington Parking Garage, a 40-year-old parking structure located at Lakeside Avenue and West 3rd Street in downtown Cleveland. The 1,100-space, four-level garage provides parking for the…
Empire Columbia
Donley’s provided concrete services on the 305,672 SF Empire Columbia (formerly Assembly Street) in Columbia, South Carolina. The apartment complex comprises 228 residential units for students attending the University of South Carolina. Empire Columbia’s amenities include study lounges, a conference…
Dillon Supply Tower
Donley’s started working on the Dillon Supply Tower project in Summer 2016. The Dillon Supply Tower was the first mixed-use development of its kind in downtown Raleigh’s Warehouse District. The project included an 18-story office tower with retail space and…
Dealer Tire Headquarters Parking Deck
Donley’s started working on the Dealer Tire Headquarters Parking Deck project in summer 2016. Located in the Midtown area of Cleveland, Dealer Tire serves more than 8,000 automotive dealerships from nearly 40 distribution centers across the US. Donley’s completed its…
Pinecrest
Donley’s served as a concrete contractor on the Pinecrest mixed-use project, which was located in an east side suburb of Cleveland, OH. The development opened in 2018 and featured 639,000 SF of open-air shopping, dining, and entertainment, plus office space,…
Reserve Square Parking Garage
Donley’s Restoration Group worked on the Reserve Square Parking Garage is a two-tower mixed use apartment complex in downtown Cleveland. The apartment building has an attached parking garage for use by guests and tenants. The garage was in need of…
Point East Condominiums Parking Garage
Donley’s provided concrete and restoration services on the Point East Condominiums Parking Garage. The Point East is a luxury high-rise condominium community located in Beachwood, Ohio. This condominium community hosts underground and above ground parking spaces. These parking areas were…
801 Rockwell Avenue Parking Deck
Working with the owner and Engineer, we devised a restoration plan to add another 15 to 20 years of serviceable life to the structure for ¼ of the cost to replace it. Donley’s Restoration Group worked with construction engineers, Barber…