Huntington Parking Garage

Huntington Parking Garage

Donley’s Restoration Group served as the design-assist subcontractor to repair and upgrade Cuyahoga County’s Huntington Parking Garage, a 40-year-old parking structure located at Lakeside Avenue and West 3rd Street in downtown Cleveland. The 1,100-space, four-level garage provides parking for the…

Assembly Street Project

Empire Columbia

Donley’s provided concrete services on the 305,672 SF Empire Columbia (formerly Assembly Street) in Columbia, South Carolina. The apartment complex comprises 228 residential units for students attending the University of South Carolina. Empire Columbia’s amenities include study lounges, a conference…

Dillon Supply Tower

Dillon Supply Tower

Donley’s started working on the Dillon Supply Tower project in Summer 2016. The Dillon Supply Tower was the first mixed-use development of its kind in downtown Raleigh’s Warehouse District. The project included an 18-story office tower with retail space and…

Headquarters Parking Deck

Dealer Tire Headquarters Parking Deck

Dealer Tire’s new Headquarters Parking Deck project in the Midtown area of Cleveland kicked off in the Summer of 2016 and was completed in March 2017. Donley’s completed the 650-car parking deck that will be part of the company’s relocation.

Pinecrest Buildings COmplex

Pinecrest

Donley’s served as a concrete contractor on the Pinecrest mixed-use project, which was located in an east side suburb of Cleveland, OH. The development opened in 2018 and featured 639,000 SF of open-air shopping, dining, and entertainment, plus office space,…

Point East Condominiums Parking Garage

Point East Condominium Parking Garage

The Point East is a luxury high-rise condominium community located in Beachwood, Ohio. This condominium community hosts underground and above ground parking spaces. These parking areas in the Point East Condominiums Parking Garage were in need of renovation, which consisted…

801 Rockwell Avenue Parking Deck

801 Rockwell Avenue Parking Deck

Working with the owner and Engineer, we devised a restoration plan to add another 15 to 20 years of serviceable life to the structure for ¼ of the cost to replace it. Donley’s Restoration Group worked with construction engineers, Barber…

Acacia Garage Repairs & Waterproofing

Acacia Garage Repairs and Waterproofing

Acacia on the Green Condominium Association selected Donley’s Restoration Group to restore their parking garage. Donley’s worked with EDI Building Consultants, the engineers on this project. The scope of work included: 83,000 sq. ft. of vehicular membrane removal & replacement…

O'Neil's Parking Garage

O’Neil’s Parking Deck

The O’Neil’s parking Deck structure was built for the City of Akron to serve the parking needs of the O’Neil’s Office Building and Canal Park, Akron’s downtown baseball stadium. The stair/elevator lobbies have direct access to several floors of the…

Weston Towers

Weston Towers

The 427,000 sq. ft. Weston Towers project comprised two separate office buildings to house MetLife’s Global Technology and Operations Hub. It includes two, seven-story office buildings; a four-level, 934-space precast parking garage; a four-level, 1,020-space precast parking deck; and 170…