Commercial
Bridgestone Technical Center Parking Deck
Donley’s was the Design-Builder for the 475-car Bridgestone Technical Center Parking Deck in Akron, OH. The four-level structure is constructed of cast-in-place, post-tensioned concrete and features LED fixtures. The design complements the Bridgestone Technical Center through the use of similar…
Sophia Street Parking Deck
Donley’s was the Design/Builder for the 297-space Sophia Street Parking Deck project in historic downtown Fredericksburg, VA. The four-level, 97,500-square-foot deck provides parking for the patrons, residents, and visitors to the city. The project was enabled through the use of…
North Parking Deck
Donley’s was the General Contractor for the North Parking Deck located adjacent to the Rocket Arena in downtown Cleveland, Ohio. The six-level, 330,000-square-foot facility is constructed of post-tensioned, cast-in-place concrete and can accommodate 1,100 vehicles. Vertical passenger access to each…
Goodyear Innovation Way Parking Deck
This 2,939-space parking deck serves Goodyear’s new world headquarters facility and features covered parking for all spaces. In addition to the parking deck, Donley’s was responsible for the construction of the 320 ft. enclosed pedestrian bridge that connects the deck to the headquarters…
West Village Parking Garage
In 2011, Donley’s provided concrete services for the West Village Parking Garage, located west of Towson Run Apartments in Towson University’s West Village precinct. Due to its high visibility from major roadways in surrounding areas, the aesthetics of the parking…
Bridgeforth Stadium Expansion
James Madison University’s Bridgeforth Stadium Expansion encompassed removing the existing West Grandstand and replacing it with a two-tiered one with approximately 14,000 seats. A new, single-tiered North End Zone Grandstand with approximately 5,400 seats was also connected to the new…
Firestone Stadium – Historic Restoration and Expansion
Responsible for the general trades package, Donley’s work on Firestone Stadium – Historic Restoration and Expansion involved both renovation and new construction. Originally built in 1925, the renovation work included vertical masonry and concrete walkway restoration. The seating capacity was…
FirstEnergy Stadium
In 1999, Donley’s completed work on the FirstEnergy stadium, home of the NFL’s Cleveland Browns. Located on the shores of Lake Erie in downtown Cleveland, the project spanned 1.64 million square feet and created seating for over 73,200 fans. When…
Progressive Field
In 1994, Donley’s served as the Prime General Trades Contractor for all interior construction and 42,000 seats of Progressive Field (formerly Jacobs Field), home to the MLB’s Cleveland Guardians, located in downtown Cleveland, Ohio. Our scope of work included: Public…
