The project included a 65,000 sq. ft. expansion to the east of the existing parking deck consisting of a slab-on-grade level and two elevated decks. Construction also included an 88,000 sq. ft. addition above the existing structure consisting of two post-tensioned, cast-in-place concrete decks.

With the existing parking deck needing to remain open throughout construction, exacting care and schedule coordination on the part of Donley’s was required, in order to minimize the disruption to the users of the facility. In addition, the project included a one-story extension to the stair and elevator tower, which also had to remain operational during construction.