East 105th Street

East 105th Street Parking Deck

Encompassing an entire city block, the parking deck is located on the southeast corner of the Cleveland Clinic’s Main Campus. With the development of the Opportunity Corridor along East 105th Street, the parking deck serves as an icon and introduction to…

North Bethesda Parking STructure

North Bethesda Conference Center Parking Structure

Donley’s completed the design-build for the North Bethesda Conference Center Parking Structure and Roadway Improvements in 2018. Located behind the existing conference center and hotel, the cast-in-place concrete parking structure accommodates 650 cars. Donley’s worked with design architect Ayers Saint…

Shady Grove Parking Deck #2

Shady Grove Garage

Donley’s provided concrete services for the Shady Grove Garage on the Universities at Shady Grove campus in Rockville, MD, which is part of the University System of Maryland. The building occupies a strategic corner of the USG campus. As such,…

Kent Central Gateway

PARTA Kent Central Gateway Transit Center

The PARTA Kent Central Gateway Transit Center is a multi-modal facility allows four modes of transportation (auto, bus, bike, and pedestrian) to intersect for users to switch modes of transportation efficiently and safely. The facility includes a 10-bus-bay transfer facility,…

Parking Deck D

Parking Deck D/B Structural Frame

This new parking deck, (Parking Deck D/B Structural Frame), is adjacent to the insurance company’s new training center in downtown Erie. In addition to its use by Erie Insurance Company employees, the structure is also used for supplemental parking for…

S-59 Parking Deck Replacement

S-59 Parking Deck Replacement

Located on University Hospital’s Case Medical Center campus in Cleveland’s busy University Circle, initial work on the S-59 Parking Deck Replacement project required the demolition of the existing 32-year-old, 950-space parking deck and pedestrian bridge on the site (which Donley’s…

First & Main Parking Deck

First & Main Parking Deck

Located in historic downtown Louisville, the First & Main Parking Deck was constructed to meet demand created by area developments and attractions. The structure features a brick facade with stone and curved arches that complement the architectural character of the…

Bowery Street Parking Deck Expansion

Bowery Street Parking Deck Expansion

The project included a 65,000 sq. ft. expansion to the east of the existing parking deck consisting of a slab-on-grade level and two elevated decks. Construction also included an 88,000 sq. ft. addition above the existing structure consisting of two…

Henry Street parking decks

Henry Street Parking Decks

Donley’s was the Design-Builder for these two 5-level precast parking decks located on Virginia Commonwealth University’s Monroe Park Campus. The Henry Street Parking Decks encompass approximately 279,400 SF and provide 761 parking spaces for faculty, staff, and students. The university…

Opportunity Park

Opportunity Park Parking Deck

The Opportunity Park Parking Deck was Donley’s second Design/Build garage project for the City of Akron. The 900-car, 313,936 SF parking facility is constructed of post-tensioned, cast-in-place concrete. Donley’s work consisted of demolition of the existing north garage and ramp,…