This structure marks Donleys second Design/Build garage project for the City of Akron. The 900-car, 313,936 sq. ft. parking facility is constructed of post-tensioned, cast-in-place concrete. Donleys work consisted of demolition of the existing North garage and ramp, and the design and construction of the new layout on the existing foundation. The five-level facility features a glass-enclosed stair tower, two elevators and a skywalk/tunnel to nearby GoJo Industries. The skywalk was completed in an impressive four weeks.