Health Science Garage

Health Science Garage Restoration

Donley’s Restoration Group provided concrete restoration services to Case Western Reserve University’s Health Science Parking Garage. This project consisted of structural repairs to the garage as well as waterproofing. Working with Carl Walker Engineering, Donley’s restoration work included: removal of deck…

O'Neil's Parking Garage

O’Neil’s Parking Deck

The O’Neil’s parking Deck structure was built for the City of Akron to serve the parking needs of the O’Neil’s Office Building and Canal Park, Akron’s downtown baseball stadium. The stair/elevator lobbies have direct access to several floors of the…

Weston Towers

Weston Towers

The 427,000 sq. ft. Weston Towers project comprised two separate office buildings to house MetLife’s Global Technology and Operations Hub. It includes two, seven-story office buildings; a four-level, 934-space precast parking garage; a four-level, 1,020-space precast parking deck; and 170…

The Quay

The Quay

Donley’s served as the concrete contractor on a three-building expansion within Bishop Gadsden’s retirement community, The Quay, in Charleston, South Carolina. The new 4-story buildings added 45 residential flats to the campus. Donley’s scope of work included: typical pile cap…

Cameron Boulevard Parking Deck

Duke University Cameron Boulevard/Science Drive Parking Deck

The Duke Cameron Science Center parking deck would have been a very challenging project for any concrete contractor. Through rigorous pre-planning, scheduling and a Lean concrete construction approach, Donley’s stepped up to the challenge and succeeded. The schedule was very…

East Parking Deck Expansion

East Parking Deck Expansion

Serving as Construction Manager, Donley’s led the Howard Community College’s East Parking Deck Expansion. The 260,000 sq. ft. expansion provided additional parking for 750 vehicles. This project was completed in January 2017. DESMAN was the designer for this project and…

Legacy Village Parking Deck

Legacy Village Parking Deck

The 135,100 sq. ft. post-tension, cast-in-place concrete Legacy Village Parking Deck structure accommodates 355 vehicles on five levels. Donley’s also served as the Construction Manager for a new 135-room hotel that includes three meeting rooms that can be combined into a…

Craige Parking Deck Expansion

Craige Parking Deck Expansion

A unique two phased project, the first phase consisted of retro-fitting of a 5-level existing parking deck (approx. 500,000 sq. ft.) which included slab on grade removal, excavation, new foundations, and slab pour-back.  New shear walls and columns were extended…

Mason Street Parking deck

Mason Street Parking Deck

Located at the corner of Mason Street and MLK Way in the University’s North Campus area, this new precast Mason Street Parking Deck facility marks the northern gateway to campus and is used for the daily parking of permit holders…

East 105th Street

East 105th Street Parking Deck

Encompassing an entire city block, the parking deck is located on the southeast corner of the Cleveland Clinic’s Main Campus. With the development of the Opportunity Corridor along East 105th Street, the parking deck serves as an icon and introduction to…