Parking Decks
North Bethesda Conference Center Parking Structure
Donley’s completed the design-build for the North Bethesda Conference Center Parking Structure and Roadway Improvements in 2018. Located behind the existing conference center and hotel, the cast-in-place concrete parking structure accommodates 650 cars. Donley’s worked with design architect Ayers Saint…
Shady Grove Garage
Donley’s provided concrete services for The Shady Grove Garage, located on the Universities at Shady Grove campus and part of the University System of Maryland. The building occupies a strategic corner of the USG campus. As such, the parking structure…
Kent Central Gateway
The Kent Central Gateway multi-modal facility provides a location for four modes of transportation (auto, bus, bike, and pedestrian) to intersect and allow users to switch modes of transportation efficiently and safely. The facility includes a 10-bus-bay transfer facility, a…
Parking Deck D/B Structural Frame
This new parking deck, (Parking Deck D/B Structural Frame), is adjacent to the insurance company’s new training center in downtown Erie. In addition to its use by Erie Insurance Company employees, the structure is also used for supplemental parking for…
S-59 Parking Deck Replacement
Located on University Hospital’s Case Medical Center campus in Cleveland’s busy University Circle, initial work on the S-59 Parking Deck Replacement project required the demolition of the existing 32-year-old, 950-space parking deck and pedestrian bridge on the site (which Donley’s…
First & Main Parking Deck
Located on the southeast corner of First and Main Streets in historic downtown Louisville, this parking deck was constructed to meet the demand created by development in the area and events at the waterfront and convention center. The structure features…
Bowery Street Parking Deck Expansion
The project included a 65,000 sq. ft. expansion to the east of the existing parking deck consisting of a slab-on-grade level and two elevated decks. Construction also included an 88,000 sq. ft. addition above the existing structure consisting of two…
Henry Street Parking Decks
Donley’s was the Design/Builder for these two 5-level precast parking decks located on VCU’s Monroe Park Campus. The Henry Street Parking Decks encompass approximately 279,400 sq. ft. and provide 761 parking spaces for faculty, staff, and students. The university accepted…
Opportunity Park Parking Deck
This structure marks Donleys second Design/Build garage project for the City of Akron. The 900-car, 313,936 sq. ft. parking facility is constructed of post-tensioned, cast-in-place concrete. Donleys work consisted of demolition of the existing North garage and ramp, and the…
Bridgestone Technical Center Parking Deck
Donley’s was the Design/Builder for this 475-car parking deck to accompany Bridgestone’s new Technical Center in Akron. The four-level structure is constructed of cast-in-place, post-tensioned concrete and features LED fixtures. The Donley team’s design complements the new Technical Center through…
