Portfolio
Columbus Hilton Downtown Expansion
Donley’s worked with Turner Construction and Smoot Construction on the Columbus Hilton Downtown Expansion. Designed by Cooper Carry, the $220 million project consisted of a 30-story post-tensioned concrete frame tower and a 7-story structural steel frame podium. The project structural…
Main2525 Apartments
Donley’s provided concrete services for Main2525 Apartments (previously known as the 2525 East Main Street Apartments), which features eight floors of apartments above a podium structure below. Main2525 lies the shadow of Richmond’s financial district, alongside the James River, in…
Shiplock Views
Donley’s provided concrete services for Purcell Construction on the 180-unit apartment building, Shiplock Views. The new building’s height is five stories on the Main Street side and nine stories above ground on the river side of the sloped site. Our…
301 Hillsborough at Raleigh Crossing
Donley’s worked with Clancy & Theys on Phase 1 of the Raleigh Crossing project, which included 301 Hillsborough, a 280,381-square foot, 19-story office tower featuring 12,162 square feet of ground floor retail located in Raleigh’s most vibrant downtown submarket. Our…
CODE (Center of Developing Entrepreneurs) Building
Donley’s provided concrete services for Hourigan Construction on the ten-story building CODE Building. The CODE (Center of Developing Entrepreneurs) building is iconic—located on the west end of the Charlottesville Downtown Mall. It will consist of Class A office space, co-working…
Cleveland Clinic Tunnel
Donley’s Restoration Group restored part of the tunnel system underneath Cleveland Clinic’s main campus. Our reach on this project included the removal of the existing roadways, prepping and then waterproofing the tunnel lid, and placing a new concrete cap (roadway)…
Akron Metropolitan Housing Authority (AMHA) Hilltop House
Donley’s Restoration Group provided concrete restoration services for Akron Metropolitan Housing Authority (AMHA) Hilltop House. The Hilltop House is used as public housing for elderly community members and Summit County residents who need housing assistance. The six story, 78 unit…
Still Hopes Phase 2 Independent Living Building
Donley’s provided concrete services for the Still Hopes Retirement Center, Phase 2 Independent Living Building. Our work on the project, located in West Columbia, South Carolina, included a basement parking garage, five stories of retirement community living, and a 1-story…
Wild Dunes Resort Hotel
Donley’s served as the concrete formwork and placement subcontractor for the Wild Dunes Resort Hotel and Conference Center on Isle of Palms, SC. Located one block from the Atlantic Ocean, the resort features 153 guest rooms, 3 meeting/conference spaces, 14…
North Charleston Coliseum Parking Deck
We recently served as part of MB Kahn’s Design-Build team for the new North Charleston Coliseum Parking Deck. The new deck can accommodate 2,000 vehicles and provides additional parking for the North Charleston Coliseum, Performing Arts Center and Convention Center…
