John Carroll University Gateway North
Donley’s provided concrete services to John Carroll University’s Gateway North project, a five-story mixed-use development. The development will include 27,940 SF of retail space and student living quarters designed to accommodate 351 students within 96 residential units.
Donley’s scope of work included:
- Column pads
- Continuous footings
- Dock leveler pit and walls
- Stair walls
- Elevator core
- Columns
- Second level post-tension deck
- Slab-on-grade
- Exterior paving
