LC Line Street Apartments

Lifestyle Communities is developing a new apartment community in downtown Charleston called LC Line Street. The first phase of the development will include 293 apartment units and 22,000 sqft of community space.  Our scope includes 450,000 square feet and over 20,000 cubic yards of concrete.

Morrison Yard Apartments

Morrison Yard Apartments

Donley’s is working for CF Evans on this new mixed-use project. Our work on the Morrison Yard development includes a cast-in-place frame for the ten-story apartment building and a two-story podium deck with a total of 17,755 cubic yards of concrete. This mixed-use project includes a market, restaurant space, offices, and a coffee shop.

530 Meeting Street

530 Meeting Street

530 Meeting Street is an approximately 200,000 square foot mid-rise student oriented apartment project located in the Upper King district. The project will boast 5 levels of residences, onsite parking and over and 6,000 square feet of amenity space. Building amenities will include a large pool and courtyard, bike storage, state of the art gym and conference rooms.

DCG is providing cast in place concrete foundations, underground water detention vault, slab on grade and 1 level structural concrete podium.

Expected to be completed by May 2019.

Cross Generating Foundations

Cross Generating Foundations

The Cross Generating Foundations project included the addition of a wastewater treatment facility to an existing 2,390 mega watt coal fired generating facility which is owned and operated by Santee Cooper. The new facility enables the plant to treat coal ash water to meet more stringent EPA regulations.

Donley’s Concrete Group scope included the following which totaled nearly 33,000 cubic yards of concrete placed on the project.

–36″ thick matt slabs and foundations
—–Cast in place pits placed within sheeting / shoring and slide rail boxes up to 16 feet deep
–Slab on grade, sloping clarifier slabs
–26 foot high push walls
–Piers, columns, and beams
–Stem walls and curbs, with trench drains and embedded angle
–Massive tank and pump pads which included anchor bolts up to 3.5” in diameter and set to a tolerance of 1/32 of an inch
–Topping slabs and trench infill for over two dozen separate structures

Assembly Street Project

Assembly Street Project

The 305,672 sq. ft. Assembly Street Project in Columbia, South Carolina consits of 228 apartment units, housing students from the University of South Carolina.

DCG provided the foundations, retaining walls, columns, sheer walls, SOG, post tension structural decks and amenity deck. There is a total of 15,000 CY’s, 811 tons of rebar and 165,000 pounds of post tension cable in the 105,000 square feet of structural deck. Project commenced Winter of 2016 and Donley’s portion was completed in the Fall of 2017.