Tower City Parking Garage

Tower City Parking Garage

Health Science Garage

Health Science Garage Restoration

Donley’s Restoration Group provided concrete restoration services to Case Western Reserve University’s Health Science Parking Garage.  This project consisted of structural repairs to the garage as well as waterproofing. Working with Carl Walker Engineering, Donley’s restoration work included: removal of deck…

O'Neil's Parking Garage

O’Neil’s Parking Deck

The O’Neil’s parking Deck structure was built for the City of Akron to serve the parking needs of the O’Neil’s Office Building and Canal Park, Akron’s downtown baseball stadium. The stair/elevator lobbies have direct access to several floors of the…

CSO Rack 14

CSO Rack 14

Working in conjunction with the Akron infrastructure firm of HM Miller, Donley’s constructed a 2.0 MGal combined sewer overflow structure basin on the north side of the Little Cuyahoga River, across from the existing CSO Rack 14 facility.  The basin…

Taussig Cancer Center

Donley’s completed the design-assist concrete and waterproofing package for the Cleveland Clinic’s new Cancer Building, Taussig Cancer Center. The 377,000 sq. ft. facility is located on Cleveland Clinic’s main campus and houses their Cancer Institute. Donley’s scope of work included:…

Hilton Convention Center Hotel

Hilton Convention Center Hotel

Donley’s served as the concrete contractor to Turner Construction, on the new Hilton Cleveland Convention Center Hotel, located in downtown Cleveland. The hotel was completed in time for the 2016 Republican National Convention, held July 18-21, 2016. Donley’s scope of work included: Structural…

Legacy Village Parking Deck

Legacy Village Parking Deck

The 135,100 sq. ft. post-tension, cast-in-place concrete Legacy Village Parking Deck structure accommodates 355 vehicles on five levels. Donley’s also served as the Construction Manager for a new 135-room hotel that includes three meeting rooms that can be combined into a…

East 105th Street

East 105th Street Parking Deck

Encompassing an entire city block, the parking deck is located on the southeast corner of the Cleveland Clinic’s Main Campus. With the development of the Opportunity Corridor along East 105th Street, the parking deck serves as an icon and introduction to…

Kent Central Gateway

Kent Central Gateway

The Kent Central Gateway multi-modal facility provides a location for four modes of transportation (auto, bus, bike, and pedestrian) to intersect and allow users to switch modes of transportation efficiently and safely. The facility includes a 10-bus-bay transfer facility, a…

S-59 Parking Deck Replacement

S-59 Parking Deck Replacement

Located on University Hospital’s Case Medical Center campus in Cleveland’s busy University Circle, initial work on the S-59 Parking Deck Replacement project required the demolition of the existing 32-year-old, 950-space parking deck and pedestrian bridge on the site (which Donley’s…