Legacy Village Parking Deck

The 135,100 sq. ft. post-tension, cast-in-place concrete parking structure accommodates 355 vehicles on five levels.

Donley’s is also served as the Construction Manager¬†for a new 135-room hotel that includes three meeting rooms that can be combined into a space of approximately 1,800 square feet, an indoor pool, an on-site fitness center, and a “Coffee to Cocktails” bar that serves food and beverages to guests and other patrons of Legacy Village from early morning through late night.

Hyatt Place Hotel

Located in Legacy Village, this hotel is the first of its kind to make its home at the lifestyle retail and office destination. The hotel and parking deck maintains the feel of and complements the surrounding structures. The exterior of the six-story hotel features a combination of red brick and pale blue, gray, and tan concrete, while steel accents, reflective blue-tinted windows, and a triangular module on the roof give the structure a modern feel.

This new 135-room hotel will include three meeting rooms that can be combined into a space of approximately 1,800 square feet, an indoor pool, an on-site fitness center, and a “Coffee to Cocktails” bar that will be open to serve food and beverages to guests and other patrons of Legacy Village from early morning through late night.

Donley’s concrete division is also serving as the concrete contractor on a 135,100 sq. ft. post-tension, cast-in-place concrete parking structure which will accommodate 355 vehicles on five levels.

PLMI-Exterior

Tomsich Pathology Laboratories (LL Building)

This new facility doubles the size of Cleveland Clinic Laboratories and is designed to support testing needs in microbiology, special chemistry, immunopathology, and molecular pathology for the Clinic system hospitals and healthcare providers worldwide. The building includes areas for clinical engineering, administration, and sales offices.

Virtual design modeling was used for design of exterior building envelop, interior space, lab mock-ups, and MEP systems. Failsafe redundancies for mechanical, electrical, and plumbing ensure that systems operate 24/7.

Sustainable features of the project include:

  • green roof
  • permeable pavers to control water run-off
  • enhanced energy performance through lighting and energy recovery
  • 95 percent of construction waste was recycled

This project is LEED Gold certified.