Donley’s served as construction manager at risk for this 1,083-car structure located at AstraZeneca‘s corporate research center in Gaithersburg, Maryland.

This parking project allowed the pharmaceutical company to increase the employee population on its key research and management campus. The deck’s functional design consisted of a double helix formed by opposing scissor ramps. Elevated and on-grade connections link the new garage with the existing Garage B and the campus loop roadway system.

Construction began in the summer of 2016 and was completed in August of 2017.