Working with the owner and Engineer, we devised a restoration plan to add another 15 to 20 years of serviceable life to the structure for ¼ of the cost to replace it. Donley’s Restoration Group worked with construction engineers, Barber & Hoffman, to provide:

  • Full and partial slab repair
  • Full joist replacement
  • Beam and column repair
  • Curb removal
  • Membrane removal and new membrane application
  • Drain replacement
  • Supplemental reinforcing steel
  • Full deck replacement
  • Construction of a new ramp reaching the top floor

Project Duration: 15 months