Donley’s was the General Contractor for this new 1,628-car parking structure, located within the University Hospitals district, serving both staff and visitors. Constructed of post-tensioned, cast-in-place concrete, the eight supported levels have horizontal traffic surfaces finished with microsilica concrete. Vertical passenger access to each parking level within the 500,000 sq. ft. structure is achieved via two glass-enclosed stair towers equipped with electric traction elevators. Exterior walls are open above concrete sill walls to permit natural ventilation and exposed concrete vertical wall surfaces are natural concrete.