CIIG Garage Structural Phase II

Donley’s Restoration Group is currently working with the Cleveland Clinic Foundation and the engineering firm GPD on the CIIG Garage Structural Phase II restoration project. Donley’s scope of work is for the complete removal and replacement of an existing 65,000.00 square foot eight-inch thick post-tension concrete deck. The project is scheduled to be completed in early fall 2022.

UH Ahuja Phase II

University Hospitals Ahuja Medical Center Phase 2 Expansion

Donley’s is currently working with Gilbane Building Company on the Ahuja Medical Center Phase 2 Expansion, a $200 million expansion to the University Hospitals campus. Designed by HKS Architects, the project consists of a 5-story pavilion addition to the existing hospital and a separate 3-story sports medicine center that includes a 45-yard turf field, and a therapy pool. The sports medicine center is the largest rehab complex in Northeast Ohio.

Donley’s scope of work for UH Ahuja Phase II includes basement walls, core walls, a connecting tunnel between the two new buildings, columns, slab on grade, and slab on metal deck.